Connor Mead – Structural Permit Set (LOA, June 2025)

⇓ 0 downloads Published June 7, 2026

Structural engineering permit set for the Connor Mead project, submitted with Letter of Assurance (LOA) in June 2025. Includes foundation plan, framing drawings, and connection details with engineer’s stamp for building department approval.

Available Files

Connor Mead (LOA) Structural Permit Set - June 24, 2025.pdf
PDF Auto-Detected vN/A

Ready in 10s  ·  Login to skip

⇓ Preparing…